Current Projects

The Shiawassee County Road Commission’s scheduled primary road projects are included below. Additional projects may be added to the PDF throughout the year. Local road projects are not included on this map.

The Shiawassee County Road Commission is responsible for roadways outside of city and village limits in Shiawassee County. The Michigan Department of Transportation (MDOT) is responsible for the construction and resurfacing of state highways. To learn more about projects in specific municipalities or on MDOT routes, please visit that agency’s website.

  • Bridge
  • Paving
  • Gravel
  • Scratch/Chip/Fog Seal
  • Crack Seal
  • Tree Trimming/Mowing

Please disable the County & Township Lines layers to select individual layers in the map.
Click here for map layer options.

Projects by Township

    • Antrim

    • Bath Road-Bancroft Rd east to Burns Township line-1950 tons 23A Gravel Hauling-(1.53 miles)

      Beard Road-east of State Rd-Skip Patch-(0.10 miles)

      Britton Road Intersections-200′ tabs Cork, Godfrey & Scribner Rds-Scratch Course/Chip Seal-(0.23 miles) (RC to contribute $34,000.00 to this project)

      Britton Road-Perry Twp Line to Burns Twp Line-Scratch Course/Chip Seal-(6.25 miles)

      Cork Road-Braden Rd to Lovejoy Rd-2600 tons 23A Gravel Hauling-(1.02 miles) – COST SHARE WITH PERRY TOWNSHIP

      Godfrey Road-south of Ellsworth Rd-150 tons 23A Spot Gravel-(0.20 miles)

      Mineral Well Brine-1 application total of 105,500 gallons continuous application-(44.74 miles)

      Nohel Road-Braden Rd to Lovejoy Rd-1300 tons 23A Gravel Hauling-(1.01 miles)

      Scribner Road-Beard Rd to Britton Rd-2550 tons 23A Gravel Hauling-(2.02 miles)

      State Road-Beard Rd to Britton Rd & 200′ tab on Ellsworth Rd-Asphalt Paving-(2.01 miles) (RC to contribute $1,000.00 to this project)

    • Bennington

    • Cook Road over the Maple River – Bridge Rehab – FEDERAL AID PROJECT

      Delaney Road-Brewer-Grand River Rd Single Chip Seal (1.00 miles)

      Delaney Road-Grand River-South to the dead end-400 Tons 23A Gravel Hauling-(.15 miles)

      Friegel Road-Bennington Rd to Garrison Rd-Scratch Course/Chip Seal-(1.00 miles)

      Gale Road-Grand River-Tyrrell Rd-4450 Tons 23A Gravel Hauling-(1.77 miles)

      Mineral Well Brine-2 applications total of 91,000 gallons continuous application-(22.37 miles)

      Ruess Road-Brewer Rd to Grand River Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

    • Burns

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Bath Road-Reed Rd to Byron Village Limits-Scratch Course/Chip Seal-(2.85 miles)

      Beard Road-Geeck Rd to New Lothrop Rd-Crack Seal-(3.95 miles)

      Britton Road-Antrim Twp Line to Grand River Rd-Scratch Course/Chip Seal-(0.44 miles

      Byam Road-Cole Rd to Grand River Rd-1350 Tons 23A Gravel Hauling-(0.52 miles)

      Cole Road-Grand River Rd to the east 0.93 miles-Scratch Course/Chip Seal-(0.93 miles)

      Grand River Road-Cole Rd to Reed Rd-Scratch Course/Chip Seal-(3.31 miles)

      McCaughna Road-Byron Rd to County Line Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

      Mineral Well Brine-2 applications total of 133,000 gallons continuous application-(33.00 miles)

      Reed Road-Grand River Rd to Bath Rd-Scratch Course/Chip Seal-(0.55 miles)

    • Caledonia Charter

    • Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH SHIAWASSEE TWP (RC to contribute $35,000 to this project)

      Mineral Well Brine-2 applications total of 62,000 gallons continuous application-(10.21 miles)

    • Fairfield

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Carland Road – Cronk to Juddville – Reconstruction – Crush and Shape- 4″ pave (1.00 mile) 2021 FEDERAL AID PROJECT

      Epton Road-Carland Rd to Vincent Rd-530 Tons 23A Gravel Hauling-(1.00 miles)

      Mineral Well Brine-2 applications total of 132,000 gallons continuous application-(28.73 miles)

      Nethaway Road-Juddville Rd south to the dead end-650 Tons 23A Gravel Hauling-(0.50 miles)

      Riley Road-from blacktop east of Meridian Rd to Vincent Rd-2150 Tons 23A Gravel Hauling-(1.70 miles)

      Vincent Road-Cronk Rd to Juddville Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

      Vincent Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.48 miles)

      Warren Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.44 miles)

    • Hazelton

    • Cronk Road over the Misteguay Creek Drain – Bridge Rehab – FEDERAL AID PROJECT

      Durand Road over the Porter Creek – Bridge Rehab – FEDERAL AID PROJECT

      Henderson Road-Byron Rd to New Lothrop Rd-Scratch Course/Chip Seal-(1.00 miles)

      Mineral Well Brine-2 applications total of 191,000 gallons continuous application-(44.98 miles)

      Riley Road over the Misteguay Creek – Bridge Rehab – FEDERAL AID PROJECT

    • Middlebury

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Balcom Road over Alder Creek – Bridge Rehabilitaion 2017 FEDERAL AID PROJECT

      Balcom Road-Hibbard Rd to Krouse Rd-5100 Tons 23A Gravel Hauling-(2.03 miles)

      Carland Road – Reconstruction – Crush and Shape- 4″ pave (1.0 mile) 2019 FEDERAL AID PROJECT

      Carland Road – Wilkinson to Cronk – Reconstruction – Crush and Shape- 4″ pave (0.98 mile) 2020 FEDERAL AID PROJECT

      Fenner Road-Mason Rd to Wilkinson Rd-2100 Tons 23A Gravel Hauling-(.82 miles)

      Mineral Well Brine-2 applications total of 152,500 gallons continuous application-(25.26 miles)

      Simpson Road-Baldwin Rd to end of the blacktop at south leg of Austin Rd-Scratch Course/Chip Seal-(1.51 miles) (RC to contribute $35,000.00 to this project)

      Warren Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(3.03 miles)

    • New Haven

    • Mineral Well Brine-2 applications total of 186,000 gallons continuous application-(46.12 miles)

      Riley Road-South leg of Kerby Rd to .5 miles west of Cram Rd-Scratch Course/Chip Seal-(1.26 miles) (RC to contribute $35,000.00 to this project)

    • Owosso Charter

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Baldwin Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(2.93 miles)

      Burning Tree Circle-North of Cloverbrook Dr-Asphalt Paving-(0.32 miles)

      Chipman Road-Mason Rd to Cronk Rd-Scratch Course/Chip Seal-(2.21 miles)

      Dewey Road over the Maple River – Bridge Rehabilitation 2017 FEDERAL AID PROJECT

      Mineral Well Brine-2 applications total of 96,000 gallons continuous application-(15.77 miles)

      Priest Road-M-21 to Mason Rd-Scratch Course/Chip Seal-(1.54 miles)

      Ruess Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.96 miles)

      Simpson Road-Baldwin Rd to Ruess Rd-Scratch Course/Chip Seal-(2.01 miles) (RC to contribute $35,000.00 to this project)

      Smith Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.01 miles)

    • Perry

    • Bath Road-Lansing Rd to M-52-Chip Seal-(2.56 miles) (RC to contribute $35,000.00 to this project)

      Beardslee Road-Bath Rd to Lansing Rd-Chip Seal-(0.10 miles)

      Beardslee Road-Braden Rd south to Woodhull Township line-1125 tons 23A Gravel Hauling-(0.45 miles)

      Bennett Drive-Britton Rd to Lansing Rd-Scratch Course/Chip Seal-(0.44 miles)

      Cork Road-Braden Rd to Lovejoy Rd-23A Gravel Hauling-COST SHARE WITH ANTRIM TOWNSHIP

      Mineral Well Brine-2 applications total of 162,000 gallons continuous application-(26.72 miles)

      Ruess Road-Bath Rd to Lansing Rd-Chip Seal-(0.94 miles)

    • Rush

    • Chipman Road-Cronk Rd to Juddville Rd-Scratch Course/Chip Seal-(1.01 miles) (RC to contribute $35,000.00 to this project)

      Mineral Well Brine-2 applications total of 207,000 gallons continuous application-(51.37 miles)

    • Sciota

    • Austin Road-Doyle Rd to Parker Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

      Brewer Road-Shaftsburg Rd-east to the Bennington Township Line Scratch Course/Chip Seal-(1.01 miles)

      Colby Lake Road-Doyle Rd to Grand River Rd-1150 Tons 23A Gravel Hauling-(0.88 miles)

      Colby Lake/Tyrrell Road-from the Woodhull Township Line to blacktop on Colby Lake Rd-1800 Tons 23A Gravel Hauling-(1.23 miles)

      Leland Road-Garrison Rd to Parker Rd Skip Patching 100 Tons 13A (0.10 miles)

      Mineral Well Brine-2applications total of 86,000 gallons continuous application-(21.36 miles)

      Old Woodbury Road-Woodbury Rd to Woodbury Rd-600 Tons 23A Gravel Hauling-(0.45 miles)

      Parker Road-Leland Rd to Shaftsburg Rd-2600 Tons 23A Gravel Hauling-(2.01 miles)

      Putnam Road-Bennington Rd to Hibbard Rd-2050 Tons 23A Gravel Hauling-(1.42 miles)

      Shaftsburg Road -Brewer Rd to Doyle Rd-Chip Seal-(0.50 miles) (RC to contribute $35,000.00 to this project)

    • Shiawassee

    • Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH CALEDONIA TOWNSHIP (RC to contribute $35,000 to this project)

      Mineral Well Brine-2 applications total of 132,500 gallons continuous application-(32.79 miles)

    • Venice

    • Lennon Road-Reed Rd to Vernon Rd-Scratch Course/Chip Seal-(1.01 miles)

      Mineral Well Brine-2 applications total of 146,000 gallons continuous application-(24.07 miles)

      Vernon Road-Lennon Rd and Lytle Rd-Culvert Replacement-42″x29″x36′ CMPA

      Vernon Road-Lytle Rd to M-21-Scratch Course/Chip Seal-(1.99 miles) (RC to contribute $35,000.00 to this project)

    • Vernon

    • Bennington Road-M-71 to Durand Rd-Scratch Course/Chip Seal-(1.71 miles)

      County Line Road over the Jones Creek – Bridge Rehab – FEDERAL AID PROJECT

      Goodall Road Bridge over the Web Creek – Bridge Rehabilitation Project- Critical Bridge Funds Local Bridge 2018 Bridge Project

      Mineral Well Brine-2 applications total of 242,000 gallons continuous application-(40.13 miles)

      Monroe Road over Three Mile River – Bridge Rehabilitation – 2017 FEDERAL AID PROJECT

      New Lothrop Road-Lansing Rd to Newburg Rd-Scratch Course/Chip Seal-(1.02 miles) – (RC to contribute $35,000 to this project)

      Pittsburg Road-Durand Road to Reed Rd-3000 tons 23A Gravel Hauling-(1.01 miles)

      Reed Road over the Holly Drain – Bridge Rehab – FEDERAL AID PROJECT

    • Woodhull

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Beard Road-0.44 miles east of Warner Rd-east to the Perry Township Line -Chip Seal-(1.58 miles) (RC to contribute $35,000.00 to this project)

      Beardslee Road-Lovejoy Rd-north to the Perry Township Line-1850 Tons 23A Gavel Hauling-(0.72 miles)

      Crack Seal-W. Scenic Lake, Sunny Point, Oak Island, Lookout Point, South Bay, Lakeshore, Lake Point, White Pine, Red Pine, Scotch Pine, Blackberry, Red Bud-(5.48 miles)

      Mineral Well Brine-2 applications total of 120,000 gallons continuous application-(19.66 miles)

      Stoll Road-end of the blacktop-west to the Clinton County Line-1000 Tons 23A Gavel Hauling-(0.39 miles)

      Tile Installation-Shaftsburg Road South of /Winegar Road/Winegar Road West of Shaftsburg Road

Projects by Road

    • Antrim Twp Line

    • Britton Road-Antrim Twp Line to Grand River Rd-Scratch Course/Chip Seal-(0.44 miles

    • Austin Road

    • Austin Road-Doyle Rd to Parker Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

    • Balcom Road

    • Balcom Road over Alder Creek – Bridge Rehabilitaion 2017 FEDERAL AID PROJECT

      Balcom Road-Hibbard Rd to Krouse Rd-5100 Tons 23A Gravel Hauling-(2.03 miles)

    • Baldwin Road

    • Baldwin Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(2.93 miles)

      Simpson Road-Baldwin Rd to end of the blacktop at south leg of Austin Rd-Scratch Course/Chip Seal-(1.51 miles) (RC to contribute $35,000.00 to this project)

      Simpson Road-Baldwin Rd to Ruess Rd-Scratch Course/Chip Seal-(2.01 miles) (RC to contribute $35,000.00 to this project)

    • Bancroft Road

    • Bath Road-Bancroft Rd east to Burns Township line-1950 tons 23A Gravel Hauling-(1.53 miles)

    • Bath Road

    • Bath Road-Bancroft Rd east to Burns Township line-1950 tons 23A Gravel Hauling-(1.53 miles)

      Bath Road-Lansing Rd to M-52-Chip Seal-(2.56 miles) (RC to contribute $35,000.00 to this project)

      Bath Road-Reed Rd to Byron Village Limits-Scratch Course/Chip Seal-(2.85 miles)

      Beardslee Road-Bath Rd to Lansing Rd-Chip Seal-(0.10 miles)

      Ruess Road-Bath Rd to Lansing Rd-Chip Seal-(0.94 miles)

    • Beard Road

    • Beard Road-0.44 miles east of Warner Rd-east to the Perry Township Line -Chip Seal-(1.58 miles) (RC to contribute $35,000.00 to this project)

      Beard Road-east of State Rd-Skip Patch-(0.10 miles)

      Beard Road-Geeck Rd to New Lothrop Rd-Crack Seal-(3.95 miles)

      Scribner Road-Beard Rd to Britton Rd-2550 tons 23A Gravel Hauling-(2.02 miles)

      State Road-Beard Rd to Britton Rd & 200′ tab on Ellsworth Rd-Asphalt Paving-(2.01 miles) (RC to contribute $1,000.00 to this project)

    • Beardslee Road

    • Beardslee Road-Bath Rd to Lansing Rd-Chip Seal-(0.10 miles)

      Beardslee Road-Braden Rd south to Woodhull Township line-1125 tons 23A Gravel Hauling-(0.45 miles)

      Beardslee Road-Lovejoy Rd-north to the Perry Township Line-1850 Tons 23A Gavel Hauling-(0.72 miles)

    • Bennett Drive

    • Bennett Drive-Britton Rd to Lansing Rd-Scratch Course/Chip Seal-(0.44 miles)

    • Bennington Road

    • Bennington Road-M-71 to Durand Rd-Scratch Course/Chip Seal-(1.71 miles)

      Friegel Road-Bennington Rd to Garrison Rd-Scratch Course/Chip Seal-(1.00 miles)

      Putnam Road-Bennington Rd to Hibbard Rd-2050 Tons 23A Gravel Hauling-(1.42 miles)

    • Braden Road

    • Beardslee Road-Braden Rd south to Woodhull Township line-1125 tons 23A Gravel Hauling-(0.45 miles)

      Cork Road-Braden Rd to Lovejoy Rd-23A Gravel Hauling-COST SHARE WITH ANTRIM TOWNSHIP

      Cork Road-Braden Rd to Lovejoy Rd-2600 tons 23A Gravel Hauling-(1.02 miles) – COST SHARE WITH PERRY TOWNSHIP

      Nohel Road-Braden Rd to Lovejoy Rd-1300 tons 23A Gravel Hauling-(1.01 miles)

    • Brewer Road

    • Brewer Road-Shaftsburg Rd-east to the Bennington Township Line Scratch Course/Chip Seal-(1.01 miles)

      Ruess Road-Brewer Rd to Grand River Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

      Shaftsburg Road -Brewer Rd to Doyle Rd-Chip Seal-(0.50 miles) (RC to contribute $35,000.00 to this project)

    • Brewer-Grand River Rd

    • Delaney Road-Brewer-Grand River Rd Single Chip Seal (1.00 miles)

    • Britton Road

    • Bennett Drive-Britton Rd to Lansing Rd-Scratch Course/Chip Seal-(0.44 miles)

      Britton Road Intersections-200′ tabs Cork, Godfrey & Scribner Rds-Scratch Course/Chip Seal-(0.23 miles) (RC to contribute $34,000.00 to this project)

      Britton Road-Antrim Twp Line to Grand River Rd-Scratch Course/Chip Seal-(0.44 miles

      Britton Road-Perry Twp Line to Burns Twp Line-Scratch Course/Chip Seal-(6.25 miles)

    • Burning Tree Circle

    • Burning Tree Circle-North of Cloverbrook Dr-Asphalt Paving-(0.32 miles)

    • Byam Road

    • Byam Road-Cole Rd to Grand River Rd-1350 Tons 23A Gravel Hauling-(0.52 miles)

    • Byron Road

    • Henderson Road-Byron Rd to New Lothrop Rd-Scratch Course/Chip Seal-(1.00 miles)

      McCaughna Road-Byron Rd to County Line Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

    • Carland Road

    • Carland Road – Cronk to Juddville – Reconstruction – Crush and Shape- 4″ pave (1.00 mile) 2021 FEDERAL AID PROJECT

      Carland Road – Reconstruction – Crush and Shape- 4″ pave (1.0 mile) 2019 FEDERAL AID PROJECT

      Carland Road – Wilkinson to Cronk – Reconstruction – Crush and Shape- 4″ pave (0.98 mile) 2020 FEDERAL AID PROJECT

      Epton Road-Carland Rd to Vincent Rd-530 Tons 23A Gravel Hauling-(1.00 miles)

    • Chipman Road

    • Chipman Road-Cronk Rd to Juddville Rd-Scratch Course/Chip Seal-(1.01 miles) (RC to contribute $35,000.00 to this project)

      Chipman Road-Mason Rd to Cronk Rd-Scratch Course/Chip Seal-(2.21 miles)

    • Colby Lake

    • Colby Lake/Tyrrell Road-from the Woodhull Township Line to blacktop on Colby Lake Rd-1800 Tons 23A Gravel Hauling-(1.23 miles)

    • Colby Lake Road

    • Colby Lake Road-Doyle Rd to Grand River Rd-1150 Tons 23A Gravel Hauling-(0.88 miles)

    • Cole Road

    • Byam Road-Cole Rd to Grand River Rd-1350 Tons 23A Gravel Hauling-(0.52 miles)

      Cole Road-Grand River Rd to the east 0.93 miles-Scratch Course/Chip Seal-(0.93 miles)

      Grand River Road-Cole Rd to Reed Rd-Scratch Course/Chip Seal-(3.31 miles)

    • Cook Road

    • Cook Road over the Maple River – Bridge Rehab – FEDERAL AID PROJECT

      Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH CALEDONIA TOWNSHIP (RC to contribute $35,000 to this project)

      Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH SHIAWASSEE TWP (RC to contribute $35,000 to this project)

    • Cork Road

    • Cork Road-Braden Rd to Lovejoy Rd-23A Gravel Hauling-COST SHARE WITH ANTRIM TOWNSHIP

      Cork Road-Braden Rd to Lovejoy Rd-2600 tons 23A Gravel Hauling-(1.02 miles) – COST SHARE WITH PERRY TOWNSHIP

    • County Line Road

    • County Line Road over the Jones Creek – Bridge Rehab – FEDERAL AID PROJECT

    • Cronk Rd

    • Chipman Road-Cronk Rd to Juddville Rd-Scratch Course/Chip Seal-(1.01 miles) (RC to contribute $35,000.00 to this project)

    • Cronk Road

    • Cronk Road over the Misteguay Creek Drain – Bridge Rehab – FEDERAL AID PROJECT

      Vincent Road-Cronk Rd to Juddville Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

    • Delaney Road

    • Delaney Road-Brewer-Grand River Rd Single Chip Seal (1.00 miles)

      Delaney Road-Grand River-South to the dead end-400 Tons 23A Gravel Hauling-(.15 miles)

    • Dewey Road

    • Dewey Road over the Maple River – Bridge Rehabilitation 2017 FEDERAL AID PROJECT

    • Doyle Road

    • Austin Road-Doyle Rd to Parker Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

      Colby Lake Road-Doyle Rd to Grand River Rd-1150 Tons 23A Gravel Hauling-(0.88 miles)

    • Durand Road

    • Durand Road over the Porter Creek – Bridge Rehab – FEDERAL AID PROJECT

      Pittsburg Road-Durand Road to Reed Rd-3000 tons 23A Gravel Hauling-(1.01 miles)

    • Epton Road

    • Epton Road-Carland Rd to Vincent Rd-530 Tons 23A Gravel Hauling-(1.00 miles)

    • Fenner Road

    • Fenner Road-Mason Rd to Wilkinson Rd-2100 Tons 23A Gravel Hauling-(.82 miles)

    • Friegel Road

    • Friegel Road-Bennington Rd to Garrison Rd-Scratch Course/Chip Seal-(1.00 miles)

    • Gale Road

    • Gale Road-Grand River-Tyrrell Rd-4450 Tons 23A Gravel Hauling-(1.77 miles)

    • Garrison Road

    • Leland Road-Garrison Rd to Parker Rd Skip Patching 100 Tons 13A (0.10 miles)

    • Geeck Road

    • Beard Road-Geeck Rd to New Lothrop Rd-Crack Seal-(3.95 miles)

    • Godfrey Road

    • Godfrey Road-south of Ellsworth Rd-150 tons 23A Spot Gravel-(0.20 miles)

    • Goodall Road

    • Goodall Road Bridge over the Web Creek – Bridge Rehabilitation Project- Critical Bridge Funds Local Bridge 2018 Bridge Project

    • Grand River Road

    • Cole Road-Grand River Rd to the east 0.93 miles-Scratch Course/Chip Seal-(0.93 miles)

      Grand River Road-Cole Rd to Reed Rd-Scratch Course/Chip Seal-(3.31 miles)

      Reed Road-Grand River Rd to Bath Rd-Scratch Course/Chip Seal-(0.55 miles)

      Reed Road-Grand River Rd to Lehring Rd-Scratch Course/Chip Seal-(0.79 miles)

    • Grand River-South

    • Delaney Road-Grand River-South to the dead end-400 Tons 23A Gravel Hauling-(.15 miles)

    • Grand River-Tyrrell Road

    • Gale Road-Grand River-Tyrrell Rd-4450 Tons 23A Gravel Hauling-(1.77 miles)

    • Henderson Road

    • Henderson Road-Byron Rd to New Lothrop Rd-Scratch Course/Chip Seal-(1.00 miles)

    • Hibbard Road

    • Balcom Road-Hibbard Rd to Krouse Rd-5100 Tons 23A Gravel Hauling-(2.03 miles)

      Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH CALEDONIA TOWNSHIP (RC to contribute $35,000 to this project)

      Hibbard Road-Cook Rd to State Rd-Scratch Course/Chip Seal-(2.48 miles) – COST SHARE WITH SHIAWASSEE TWP (RC to contribute $35,000 to this project)

    • Huff Road

    • Vincent Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.48 miles)

      Warren Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.44 miles)

    • Juddville Road

    • Nethaway Road-Juddville Rd south to the dead end-650 Tons 23A Gravel Hauling-(0.50 miles)

    • Kerby Road

    • Riley Road-South leg of Kerby Rd to .5 miles west of Cram Rd-Scratch Course/Chip Seal-(1.26 miles) (RC to contribute $35,000.00 to this project)

    • Lansing Road

    • Bath Road-Lansing Rd to M-52-Chip Seal-(2.56 miles) (RC to contribute $35,000.00 to this project)

      New Lothrop Road-Lansing Rd to Newburg Rd-Scratch Course/Chip Seal-(1.02 miles) – (RC to contribute $35,000 to this project)

    • Lehring Road

    • Vernon Road-Lehring Rd north to the dead end-900 Tons 23A Gravel Hauling-(0.35 miles)

    • Leland Road

    • Leland Road-Garrison Rd to Parker Rd Skip Patching 100 Tons 13A (0.10 miles)

      Parker Road-Leland Rd to Shaftsburg Rd-2600 Tons 23A Gravel Hauling-(2.01 miles)

    • Lennon Road

    • Lennon Road-Reed Rd to Vernon Rd-Scratch Course/Chip Seal-(1.01 miles)

      Vernon Road-Lennon Rd and Lytle Rd-Culvert Replacement-42″x29″x36′ CMPA

    • Lovejoy Road

    • Beardslee Road-Lovejoy Rd-north to the Perry Township Line-1850 Tons 23A Gavel Hauling-(0.72 miles)

    • Lytle Road

    • Vernon Road-Lytle Rd to M-21-Scratch Course/Chip Seal-(1.99 miles) (RC to contribute $35,000.00 to this project)

    • M-21

    • Baldwin Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(2.93 miles)

      Priest Road-M-21 to Mason Rd-Scratch Course/Chip Seal-(1.54 miles)

      Warren Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(3.03 miles)

    • M-71

    • Bennington Road-M-71 to Durand Rd-Scratch Course/Chip Seal-(1.71 miles)

    • Mason Road

    • Chipman Road-Mason Rd to Cronk Rd-Scratch Course/Chip Seal-(2.21 miles)

      Fenner Road-Mason Rd to Wilkinson Rd-2100 Tons 23A Gravel Hauling-(.82 miles)

      Ruess Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.96 miles)

      Smith Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.01 miles)

    • McCaughna Road

    • McCaughna Road-Byron Rd to County Line Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

    • Monroe Road

    • Monroe Road over Three Mile River – Bridge Rehabilitation – 2017 FEDERAL AID PROJECT

    • Nethaway Road

    • Nethaway Road-Juddville Rd south to the dead end-650 Tons 23A Gravel Hauling-(0.50 miles)

    • New Lothrop Road

    • New Lothrop Road-Lansing Rd to Newburg Rd-Scratch Course/Chip Seal-(1.02 miles) – (RC to contribute $35,000 to this project)

    • Nohel Road

    • Nohel Road-Braden Rd to Lovejoy Rd-1300 tons 23A Gravel Hauling-(1.01 miles)

    • Old Woodbury Road

    • Old Woodbury Road-Woodbury Rd to Woodbury Rd-600 Tons 23A Gravel Hauling-(0.45 miles)

    • Parker Road

    • Parker Road-Leland Rd to Shaftsburg Rd-2600 Tons 23A Gravel Hauling-(2.01 miles)

    • Perry Twp Line

    • Britton Road-Perry Twp Line to Burns Twp Line-Scratch Course/Chip Seal-(6.25 miles)

    • Pittsburg Road

    • Pittsburg Road-Durand Road to Reed Rd-3000 tons 23A Gravel Hauling-(1.01 miles)

    • Priest Road

    • Priest Road-M-21 to Mason Rd-Scratch Course/Chip Seal-(1.54 miles)

    • Putnam Road

    • Putnam Road-Bennington Rd to Hibbard Rd-2050 Tons 23A Gravel Hauling-(1.42 miles)

    • Reed Road

    • Bath Road-Reed Rd to Byron Village Limits-Scratch Course/Chip Seal-(2.85 miles)

      Lennon Road-Reed Rd to Vernon Rd-Scratch Course/Chip Seal-(1.01 miles)

      Reed Road over the Holly Drain – Bridge Rehab – FEDERAL AID PROJECT

      Reed Road-Grand River Rd to Bath Rd-Scratch Course/Chip Seal-(0.55 miles)

      Reed Road-Grand River Rd to Lehring Rd-Scratch Course/Chip Seal-(0.79 miles)

    • Riley Road

    • Riley Road over the Misteguay Creek – Bridge Rehab – FEDERAL AID PROJECT

      Riley Road-from blacktop east of Meridian Rd to Vincent Rd-2150 Tons 23A Gravel Hauling-(1.70 miles)

      Riley Road-South leg of Kerby Rd to .5 miles west of Cram Rd-Scratch Course/Chip Seal-(1.26 miles) (RC to contribute $35,000.00 to this project)

    • Ruess Road

    • Ruess Road-Bath Rd to Lansing Rd-Chip Seal-(0.94 miles)

      Ruess Road-Brewer Rd to Grand River Rd-2550 Tons 23A Gravel Hauling-(1.00 miles)

      Ruess Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.96 miles)

    • Scribner Road

    • Scribner Road-Beard Rd to Britton Rd-2550 tons 23A Gravel Hauling-(2.02 miles)

    • Shaftsburg Road

    • Brewer Road-Shaftsburg Rd-east to the Bennington Township Line Scratch Course/Chip Seal-(1.01 miles)

      Shaftsburg Road -Brewer Rd to Doyle Rd-Chip Seal-(0.50 miles) (RC to contribute $35,000.00 to this project)

      Tile Installation-Shaftsburg Road South of /Winegar Road/Winegar Road West of Shaftsburg Road

    • Simpson Road

    • Simpson Road-Baldwin Rd to end of the blacktop at south leg of Austin Rd-Scratch Course/Chip Seal-(1.51 miles) (RC to contribute $35,000.00 to this project)

      Simpson Road-Baldwin Rd to Ruess Rd-Scratch Course/Chip Seal-(2.01 miles) (RC to contribute $35,000.00 to this project)

    • Smith Road

    • Smith Road-Mason Rd to Wilkinson Rd-Scratch Course/Chip Seal-(1.01 miles)

    • State Road

    • State Road-Beard Rd to Britton Rd & 200′ tab on Ellsworth Rd-Asphalt Paving-(2.01 miles) (RC to contribute $1,000.00 to this project)

    • Stoll Road

    • Stoll Road-end of the blacktop-west to the Clinton County Line-1000 Tons 23A Gavel Hauling-(0.39 miles)

    • Tyrrell Road

    • Colby Lake/Tyrrell Road-from the Woodhull Township Line to blacktop on Colby Lake Rd-1800 Tons 23A Gravel Hauling-(1.23 miles)

    • Various Roads

    • Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Arm Mowing and Foliar Brush Control-Various Locations TBD by Township Supervisor

      Crack Seal-W. Scenic Lake, Sunny Point, Oak Island, Lookout Point, South Bay, Lakeshore, Lake Point, White Pine, Red Pine, Scotch Pine, Blackberry, Red Bud-(5.48 miles)

      Mineral Well Brine-1 application total of 105,500 gallons continuous application-(44.74 miles)

      Mineral Well Brine-2 applications total of 120,000 gallons continuous application-(19.66 miles)

      Mineral Well Brine-2 applications total of 132,000 gallons continuous application-(28.73 miles)

      Mineral Well Brine-2 applications total of 132,500 gallons continuous application-(32.79 miles)

    • Vernon Road

    • Vernon Road-Lehring Rd north to the dead end-900 Tons 23A Gravel Hauling-(0.35 miles)

      Vernon Road-Lennon Rd and Lytle Rd-Culvert Replacement-42″x29″x36′ CMPA

      Vernon Road-Lytle Rd to M-21-Scratch Course/Chip Seal-(1.99 miles) (RC to contribute $35,000.00 to this project)

    • Vincent Road

    • Vincent Road-Cronk Rd to Juddville Rd-1300 Tons 23A Gravel Hauling-(1.01 miles)

      Vincent Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.48 miles)

    • Warren Road

    • Warren Road-Huff Rd to Ridge Rd-600 Tons 23A Gravel Hauling-(0.44 miles)

      Warren Road-M-21 to Hibbard Rd-Scratch Course/Chip Seal-(3.03 miles)

    • Woodbury Road